Journal of Progress--September 14-September 20

 Under these tarps is top soil.  The plan is to build grow boxes for a garden next year.  Our soil here is truly horrific.  We purchased this top soil and had it delivered from Nephi.  Barbara then covered it with tarp pieces and weighted them down with rocks so the wind doesn't blow it all away before it can be used as projected.


Don continues to lay finish floor in the "Great Room" downstairs. 

Don continues laying flooring around the kitchen island. If he's perfectly aligned, the flooring will match edges on both sides of the island when he gets past the end.

Working on the stove with the help of our bishop and our former bishop. Still not ready to use.

Trying to get the bathroom wall ready for the dryer. Need to install the dryer vent and add another outlet that won't be hidden by the dryer, for things like a hair dryer,, night light, etc..

Installing the outside part of the vent.





Comments

Popular posts from this blog

Journal of Progress

Journal of Progress--July

Building an Outhouse