Journal of Progress--First Week of September
Friday, September 1,
2017
We had family and friends visit. Don pretty much
spent his time getting ready for our guests. He cleaned up things which might be dangerous for children, he covered the root
cellar so no child fell in, and he made a path to the outhouse.
Pat let the grandchildren play with his go-cart.
Saturday, September
2, 2017
Don learned when
they put the last floor boards on that the house is not square.
Using a nail in each corner, string, and a measuring tape, he learned
that it is four inches off in one corner. That is actually huge in
house construction, and he will have to make some adjustments. He
worked on laying the boards for the porch.
Sunday, September 3, 2017
Barbara wasn't feeling well and stayed home from church. Wasps were swarming
the humming bird feeder. Barbara even saw the queen. She was bigger than
the others and had much bigger wings. When she came, the others
scattered and then they stayed pretty much on the bottom while she
was on the top. Eventually, Don lifted the feeder off the branch
with a long pole and dumped it in some soapy water. They still
swarmed the branch where it had been. Eventually, Don sprayed the
branch with wasp spray and then they went away. Barbara made a wasp trap
with the humming bird solution and hung it on the fence.
Monday, September 4,
2017
Don said we could
call this the Adventures of Don Sawyer. Don and Gordon got the 2 x 4’s out
of the basement and set up a measurement thing to cut them and cut
them to length. After Gordon left, I saw Don pulling the
the ones they had cut and recutting them. He said they got them too
long. We had another visit from family and Daniel, Guido, and Christopher helped recut the boards.
Tuesday, September
5, 2016
Don worked on the
deck today.
Wednesday, September
6, 2017
Don finished the deck and
worked a bit on his geo-thermal cooling.
Thursday, September
7, 2017
Don worked on
bedding his geo-thermal pipes. We had a visit to the city where we visited two Restores and bought a window and some bathroom fixtures.
Friday, September 8,
2017
Don worked on laying out the stairs into the root cellar and then he
finished his pipes for his cold air vent. This is the summer view when they will take in air to be cooled below ground. In the winter, they will be capped.
Dan brought over a little helping hand for Don. It is a very little hand. They have the same Cub Scout sense of humor.
Saturday, September
9, 2017
Don built stairs to
the basement today. He started right off and he worked all day until
7 pm. He was discouraged. The stringers (the supports that hold up
the stairs) were cracking when he put the stairs on. He also hit his
thumb hard so he was hurting. Harry came over and told him how to
deal with the cracking in the stringers so he felt better after that.
It was cold today, cloudy much of it. The wind blew and it rained
some. Don worked right through the rain. He said he and Dan hid out
in the root cellar for about an hour and talked during the worst of
it.
Lots of progress since I was there. I hope that Don's finger is okay.
ReplyDelete